The Confederation Bridge connects Prince Edward Island to New Brunswick across the Northumberland Strait. At almost 13 kilometres, it is the longest bridge in the world over water that freezes in winter. The bridge extends from Borden-Carleton on the island to Cape Jourimain on the mainland. Most of the roadway is elevated high above the water, although the central navigation span rises to approximately 60 metres so that ocean vessels can travel underneath. The bridge is deliberately curved, because engineers believed that a straight roadway of this length could make drivers tired and inattentive. Under normal conditions, a vehicle requires approximately ten minutes to complete the crossing.

The bridge fulfilled a constitutional promise from 1873, when Prince Edward Island joined Confederation. At that time, the federal government agreed to provide continuous year-round transportation to the mainland. For many decades, this obligation was satisfied by ferries, which transported passengers, vehicles and freight between Borden and Cape Tormentine. However, the ferry service was frequently delayed by storms and by thick winter ice. In a 1988 plebiscite, a majority of island voters supported the construction of a permanent fixed link. Some fishers and ferry employees opposed the project, because they were concerned about the lobster fishery and about their employment.

Using the drop-down menu, choose the best option for each question.

1. Not everyone in the region wanted a fixed link to be built.
2. The largest sections of the bridge were produced on shore.
3. Drivers heading to Prince Edward Island cross the bridge free of charge.
4. The curved shape of the bridge helps keep drivers focused.
5. Lobster catches in the strait declined after the bridge opened.
6. Before the bridge existed, boats moved vehicles and goods between the two provinces.
7. A private firm was responsible for constructing the bridge.
8. Control of the bridge is planned to pass to Ottawa at a later date.
9. Large ships are able to sail under the highest section of the bridge.